Mine tooteinfo juurde

Critical Path Analysis in Practice

Gail Thornley

Tavaline hind €243,50
Müügihind €243,50 Tavaline hind €251,50 Väljamüük

Meil on laos

Eeldatav tarne
teisipäeval, 1. septembril
* Kõik tellimused toimetatakse kohale 5–10 tööpäeva jooksul.
Küsimuste korral kirjutage info@bookshop.lt
Turvaline ost
14-päevane tagastusgarantii. Toote saab tagastada ilma põhjust nimetamata.
Autorius Gail Thornley
Kalba Anglų k.
Leidimo metai 2001 m.
Puslapių skč. 166 psl.
Viršelis Kietas viršelis
ISBN 9780415264723

Critical Path Analysis in Practice

Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Book cover of: Critical Path Analysis in Practice. By: Gail Thornley

Critical Path Analysis in Practice

Tavaline hind €243,50
Müügihind €243,50 Tavaline hind €251,50